A-A-55080A
to the mark. The temperature of the water shall be 73.5 ± 2 degrees F. The cover shall then be
suspended over a dry receptacle for a period of 3 hours. At the end of the 3-hour period, the cover
shall be examined for seam separation and leakage of the water into the receptacle.
5.4.4. Packaging Examination., The fully packaged shipping containers shall be examined in
accordance ANSI/ASQC Z 1.4 published by the American Society' for Quality Control and in
accordance with defects listed below. The lot size shall be the number of shipping containers in the
inspection lot.
Examination
Defect
Material
Missing, damaged, not as required.
Content
Number of covers per shipping container is more or
Less than required..
6. Packaging.
6.1. Packaging, Packing, Marking, and Palletization
Packaging, packing, marking and palletization shall be in accordance with ASTM-D 3951.
Note: Each shipping container shall contain only one National Stock Number (NSN) and a total
quantity of 1000 size 1 covers, 350 size 2 covers, 250 size 3 covers and 100 size 4 covers, packaged
as specified above.
7. NOTES
7.1 Source of Government Documents. Copies of Military and Federal documents are available from:
Standardization Documents Order Desk
Bldg. 4D
700 Robbins Avenue
Philadelphia, PA 19111--5094
7.2 Sources of Non-government Documents
ANSI/ASQC Zl.4 - Sampling Procedures and Tables For Inspection By Attributes
(Applications for copies should be addressed to American National Standards Institute, 1430
Broadway, New York, NY 10018-3308.)
ASTM TEST METHODS
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business